CN
The 32m Wind Farm Service CAT is Successfully held Keel-laying Ceremony
2022-05-26

Recently, the first 32m Wind Farm Service CAT of China Energy Conservation (Yangjiang) Wind Power Co., Ltd. contracted by Aulong shipbuilding has successfully completed the Keel-laying. 



The vessel is an all-aluminum alloy catamaran with a total length of 32.3 meters, a width of 10 meters, and a depth of 3.5 meters. It is propelled by two engines and two propellers, and its designed speed is no less than 25 knots.  Designed according to the sea conditions in the South China Sea, the vessel has good maneuverability, seakeeping & wind and wave resistance. It can meet the needs of wind power operation and maintenance operations and transport of personnel and materials under complex sea conditions, and help the development of the offshore wind power industry.  

BACK
LEAVE YOUR MESSAGE

Get Business Cooperation Quickly